WP 5
Work Package 5
Work Package 5 includes the following improvements:
-
Widening of US-75 from north of the I-44 bridges to just south of W. 41st Street to eight lanes (four lanes in each direction). Initially, US-75 will be striped for 3 lanes in each direction until the remainder of the corridor is widened to 8 lanes. This will include new bridges over the new W. 51st Street extension, W. 49th Street, and W. 46th Street.
-
Reconstruct the I-44 westbound to US-75 northbound ramp.
-
Reconstruct the US-75 southbound to I-44 eastbound ramp. This will be a flyover ramp bridge that will span over I-44 and US-75. The existing loop ramp will be removed.
-
Reconstruct the US-75 southbound to I-44 westbound ramp. This includes a new bridge over the new extension of W. 51st Street.
-
Reconstruct the US-75 northbound to I-44 westbound ramp. This will be a flyover ramp bridge that will span over I-44 and US-75. The existing loop ramp will be removed.
-
Reconstruct the I-44 eastbound to US-75 northbound loop ramp.
-
Reconstruct and extend W. 51st Street from S. Tacoma Avenue east under US-75 to just east of S. Indian Avenue.
-
Work Packages 2 and 5 will be constructed together.